Basent Renovation PHASE II Begins…
Posted by: admin In: basement renovation ()
It’s time for the “back half” of the basement to undergo it’s renovation. This will include the renovation of a full bath, a kitchen and the addition of a bedroom. The kitchen will become more of a kithenette with bar area. A lot of the ceiling drywall was ripped out and a partial wall built early becasue we did a total kitchen renovation above it (see Pictures of Kitchen ) which included a heavy re-do of electric and and dedicated sub panel – removing the drywall in anticipation of doing this project helped a lot with access. The wall was put up becuase there is a granite topped island over a travertine floor above. I didn’t want the floor settleing with all that weight prior to putting this wall in – which will be the bedroom wall.
Its a mess and about to become more of a mess:
In the shot below, the studs are for the wall sectioning off what will be a bedroom to the right. Straight back is the walk-out doorway. The kitchen is to the immediate left (no viewable).